Rebuilding in Pacific Palisades | Lessons from Malibu
What a home needs to become, and what a site allows it to become, should be considered together. Our Kanan Dume Residence offers a design story from Malibu; the guide below connects that experience with the steps homeowners need to investigate in Pacific Palisades.
Vidastudio is a Buenos Aires-based architecture and design practice working across Argentina, Uruguay and the United States. Kanan Dume is a Woolsey Fire reconstruction in Malibu, not a Pacific Palisades project.

Rebuilding guide
Official resources checked November 27, 2026. This is a starting checklist for a single-family rebuild. Confirm the requirements for your address and proposal with the reviewing agencies.
1. Confirm the jurisdiction and collect records
Start with the property address, parcel information, earlier permits, approved drawings and Certificate of Occupancy. Identify whether the reviewing authority is the City of Los Angeles or another jurisdiction; the City and unincorporated County use separate processes. For City properties, begin with LADBS wildfire recovery resources. For unincorporated parcels, use the County permit guide.
2. Establish the permitted pre-fire baseline
Compare your records with what stood on the lot before the fire. The City may consider permits, occupancy records and Assessor or Coastal Commission records. Confirm debris-removal completion and the required final sign-off. Do not assume an existing foundation can be reused: an engineering assessment and approval are needed. Read the City’s rebuilding FAQs.
3. Choose the applicable rebuild route
Ask Planning about EO1, the conditional like-for-like route within 110% of the original footprint and height, or EO8 for qualifying zoning-compliant single-family rebuilds in the Coastal Zone. Other proposals need the applicable planning and coastal reviews. Check eligibility.
4. Check constraints before fixing the design
Check zoning, coastal status, setbacks, title restrictions and HOA covenants. Ask Planning about bluff and biological studies. HOA review is separate from City permitting. Establish the buildable envelope before fixing room layouts. Review site constraints.
5. Assemble the design and engineering team
Define professional responsibilities and the drawings, calculations and studies your site needs. California-licensed design professionals may be required; verify the relevant credentials and any special program eligibility. The County’s guide to preparing plans explains the roles of design and engineering professionals. For City projects, use LADBS submittal and geotechnical resources to confirm the required package.
6. Develop and submit coordinated plans
For City properties, submit complete plans and construction documents through ePlanLA or the One-Stop Rebuilding Center. Earlier permits and occupancy records may also be needed. Work through review comments with the project team. LADBS explains how to apply for a repair or rebuild permit.
For unincorporated County sites, the package may include sections, framing and foundation drawings, construction details, structural calculations and energy documentation. Hillside, geological, wastewater and fire-zone conditions can add requirements. County submission checklist.
7. Resolve clearances, utilities and fees
For City sites, confirm the applicable drainage, sewer, driveway, fire access, grading, utility and other clearances. Coordinate power, water and gas restoration early. The City rebuilding guide links the departments involved. Check current fee-waiver eligibility separately: ownership history and project conditions matter, so do not budget on an assumed exemption.
8. Obtain permits, build and complete inspections
Once the required permits are issued, construction can proceed within their conditions. Arrange the required inspections as work advances and complete the approvals needed for occupancy. LADBS explains the sequence from permit to construction inspections and Certificate of Occupancy in its homeowner guidance. A plan submission or an expedited review target does not authorize construction.
The Malibu house | Design within a clear brief
Kanan Dume Residence, published in our portfolio as Malibu Residence, rebuilds a private home after the Woolsey Fire on a four-acre site in the Santa Monica Mountains. The project had to remain within its original footprint with an expansion limited to 10%. That is the constraint documented for this Malibu project, not the rule for every Palisades property.
The design separates the main gathering spaces from the bedrooms, while exterior extensions connect the interiors to the landscape. A main house and guest house share an architectural language. Together they contain 7,800 sq ft (725 m²) of covered area.
Vidastudio’s documented role includes design, construction documents, design supervision during construction, interior design and furniture selection. The existing case study includes the November 2026 construction update and approved project imagery.

What carries across
The useful lesson is a design method: establish the site’s limits, organize the household’s needs clearly, and develop the house and its outdoor spaces together. A constrained envelope can still support generous gathering areas, privacy and a strong relationship with the setting.
For a Palisades enquiry, we start with your property and priorities. The project-specific scope, required licensed professionals and responsibilities must be established before work is agreed.
Bring to the first conversation
Your address, available property records, site photographs, household needs, budget priorities and intended timetable help establish the brief. Include any existing agency correspondence so the project team can identify what has already been reviewed.